Solid Bulk Port Terminal (Grains/Fertilizers)

Investors Data Room

Tegran Kennedy: the new frontier of agribusiness in Brazil's Southeast

TEGRAN Kennedy is set to transform logistics for Brazil's agribusiness sector. Located in Presidente Kennedy, Espírito Santo, the Grains and Fertilizers Port Terminal is strategically integrated into the Porto Central complex, which is already under construction, providing the project with a strong infrastructure and development platform.

Designed to connect Brazil's major producing regions to global markets, TEGRAN Kennedy combines advanced technology, operational efficiency, and an integrated approach to sustainability. The terminal will expand logistics alternatives for grains, fertilizers, and other solid bulk commodities, strengthening the connection between production, industry, infrastructure, and international trade.

More than a new port terminal, TEGRAN Kennedy represents a new logistics frontier for agribusiness in Brazil's Southeast, bringing Brazilian producers closer to major international markets and creating new opportunities for efficient, competitive, and sustainable trade.

The project

Terminal masterplan drawing showing warehouses, internal roads and berths
Terminal masterplan
Rendering of the terminal gate with access booths and trucks
Gate
Rendering of the cargo inspection shed with trucks in position
Cargo inspection
Rendering of the truck dumpers with dust extraction and a bulk truck
Truck dumpers
Aerial rendering of the fertilizer warehouse with a queue of trucks
Fertilizer warehouse
Rendering of the fertilizer warehouse interior with a wheel loader
Fertilizer warehouse Tegran
Rendering of the ship unloader working on a vessel berthed at the pier
Ship unloader
Grain cargo system
Grain cargo system

WORKS AT THE CENTRAL PORT

Phase 1 - 2025 vegetation suppression / leveling
Phase 1 - 2025 vegetation suppression / leveling
Phase 1 - 2025 vegetation suppression / leveling
Phase 1 - 2025 - Construction site
Phase 1 - 2025 - Exploration and transport of rocks in the quarry.
Rocks deposit at shore for the breakwater
Leveled land 1half 2026

Developed by